Chapter 3 – To read from the beginning of this saga, please click here. The rejections came, and quickly! Both the grading and building permit applications were incomplete. The county planners asked for more complete soils engineering plans. I cont…
Read on blog or Reader
Site logo image thelawlers.com Read on blog or Reader

Rejection, again!

By Brian Lawler on June 27, 2024

Chapter 3 – To read from the beginning of this saga, please click here.

The rejections came, and quickly! Both the grading and building permit applications were incomplete. The county planners asked for more complete soils engineering plans. I contacted the soils engineering firm, and got the broader soils reports and submitted those to the county the next day. Then I awaited the next rejection or correction request.

This is the fasteners page of the steel building engineering plan. These structures are quite complex.

Chapter 4 – Money

The permit applications then passed the "intake" phase. I knew this because the county sent me an invoice for just under $11,000. I was told that this is normal for projects like mine. I gulped, but was relieved to have gotten over the first major hurdle. Asking for money indicated that the County had accepted my applications. Those fees go to pay for the planners to review the plans (and send them back for corrections and additions). These fees also pay for local schools, based on construction costs, and other operations of our local government.

It was the largest charge I had ever put on a credit card. I went online and put the fees into my cart, then put in my card number and pushed the PAY NOW button. And it worked!

After the fees were paid, the planners dug in to my plans, checking them against local and national codes. Since my building is so simple, there isn't much to consider. I have grading plans, engineering drawings for the concrete pad, engineering details for the steel building, and the soils report. Then there is the electrical plan, which includes lighting, electrical outlets, several in-floor power boxes, and three ventilation fans. I didn't expect much difficulty on those items. I was wrong, of course.

Chapter 5 – Corrections

In mid-May, I received a letter from the County indicating that my plans had been reviewed and that a Corrections document had been generated. In that letter were 26 corrections and comments. One example: "Remove the heat pump. This type of building cannot have heating or cooling." Another: "Electrical outlets below 5'4" from the floor must have tamper-resistant covers."

There were a small number of questions about the concrete foundation engineering, all of which were answered by the firm I hired to do the engineering. The man at the County rejected the structural engineering drawings provided by the building manufacturer because they were based on the wrong California Building Code year. I paid an additional $1,850 to the manufacturer to get new structural drawings. The only thing that engineer changed, as far as I can tell, was the date. Ouch!

I was told to remove the smoke detectors I had included in my plans; I also removed a booster pump for the fire sprinkler system, and had the contractor replace that with a water main fed by an upstream pump. I added motion-sensing light controls on the exterior of the building, and added motion- and occupancy-sensing controls on the interior.

The most difficult item in the list was the Collateral Load calculation for the building's roof. Apparently, most steel buildings have an excess load carrying capacity (Collateral Load) in the range of 3-5 pounds per square foot (psf). My building has only a 1 psf capacity.

The County was concerned that the fire sprinkler pipes, charged with water, combined with electrical conduits, light fixtures, and wiring would exceed the 1 psf value. I was in a bind. I asked the sprinkler contractor how much the sprinkler system would weigh, then added to that all the electrical loads, and made a spreadsheet showing that the total weight of these would be just over 0.3 psf –well below 1 psf, and (I hope) this makes the building's Collateral Load capacity able to support those things with strength to spare.

Chapter 6 –Resubmittal

Making all these changes took several weeks, and lots of conversations with engineers, contractors and the County planner. I had to re-submit all of the elements of the building permit application at the same time to allow the County to review version 2 of all of this. I did that on June 16. Now I wait for their response.

Chapter 7 – And that's only half the application!

There are two big parts to this application process: first, the building and its foundation, and second, the grading necessary for the building. Those are treated as two different projects by the County. They have different analysts looking at the two parts. Ironically, the building was reviewed prior to the grading. The grading must go first, obviously, but the planner has not yet begun to review the grading plans. That will happen in early July.

More on this project as the various steps are made. I'll report here as it happens!

Comment

thelawlers.com © 2024.
Manage your email settings or unsubscribe.

WordPress.com and Jetpack Logos

Get the Jetpack app

Subscribe, bookmark, and get real‑time notifications - all from one app!

Download Jetpack on Google Play Download Jetpack from the App Store
WordPress.com Logo and Wordmark title=

Automattic, Inc.
60 29th St. #343, San Francisco, CA 94110

at June 27, 2024
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

A small, limited batch - and a few lines that stayed with me

"Meaningful work is the sort where we place our entire selves, squarely and resolutely, and thereby find ourselves." ...

  • The Consecrated Eminence: 80 Years Later: Remembering Hiroshima and Nagasaki August 6 & 9, 1945
    ...
  • [New post] Mackintosh — Beyond the Swelkie (2021)
    peterson10 posted: "Mackintosh, Jim, and Paul S. Philippou, eds. Beyond the Swelkie: A Collection of Poems and Writings Cel...
  • PLDT Home honors mothers on their special day with a heartwarming video titled Backstage Moms
    Motherhood is definitely one of the hardest endeavors a woman can take in her li...

Search This Blog

  • Home

About Me

BookStudyDigest
View my complete profile

Report Abuse

Blog Archive

  • February 2026 (11)
  • November 2025 (1)
  • August 2025 (2)
  • April 2025 (1)
  • September 2024 (859)
  • August 2024 (946)
  • July 2024 (879)
  • June 2024 (843)
  • May 2024 (875)
  • April 2024 (1018)
  • March 2024 (1239)
  • February 2024 (1135)
  • January 2024 (934)
  • December 2023 (923)
  • November 2023 (818)
  • October 2023 (743)
  • September 2023 (712)
  • August 2023 (722)
  • July 2023 (629)
  • June 2023 (566)
  • May 2023 (584)
  • April 2023 (629)
  • March 2023 (551)
  • February 2023 (399)
  • January 2023 (514)
  • December 2022 (511)
  • November 2022 (455)
  • October 2022 (530)
  • September 2022 (418)
  • August 2022 (412)
  • July 2022 (452)
  • June 2022 (467)
  • May 2022 (462)
  • April 2022 (516)
  • March 2022 (459)
  • February 2022 (341)
  • January 2022 (385)
  • December 2021 (596)
  • November 2021 (1210)
Powered by Blogger.